Richard M. Nixon Library Wing Addition & Auditorium Remodel

Richard M. Nixon Library Wing Addition & Auditorium Remodel

Cedars-Sinai Medical Center

Cedars-Sinai Medical Center

Claremont McKenna College Biszantz Family Tennis Facility

Claremont McKenna College Biszantz Family Tennis Facility

County of Los Angeles Castaic Pool & Sports Complex

County of Los Angeles Castaic Pool & Sports Complex

California State University San Bernardino Student Recreation Center

California State University San Bernardino Student Recreation Center

SCE CTAC Showroom Remodel

SCE CTAC Showroom Remodel

San Antonio Community Hospital

San Antonio Community Hospital

SCE Dexus Photovoltaic Panel Installation

SCE Dexus Photovoltaic Panel Installation

The Autry Nature Education Facility Project

The Autry Nature Education Facility Project

Renovation

MORE INFO

County of San Bernardino DBH Crisis

County of San Bernardino DBH Crisis

Residential Treatment Facility

Ground Up.

MORE INFO

Girl Scouts of Orange County Leadership Center

Girl Scouts of Orange County Leadership Center

New construction

MORE INFO

 

Cedars-Sinai Medical Center Steven Spielberg Human Physiology Lab Remodel

Cedars-Sinai Medical Center Steven Spielberg Human Physiology Lab Remodel

Project consisted of a 6,500 sq. ft. OSHPD regulated tenant improvement on the second floor of the Steven Spielberg Building located on the Cedars-Sinai Medical Center Campus in Los Angeles.  The project was constructed while labs, exam rooms and offices were in full operation below.  The project scope included; infectious control, off hours work, demolition, installing plumbing over sensitive lab space, upgrading electrical system to code, nurse call code blue and emergency pull cords, decorative 3 Form partitions, structural steel upgrades, drywall, millwork, MEP, security card readers, fire sprinkler, fire alarm, flooring and painting.   Additionally Perera  prepared the space for state licensing and providing all the required testing and reports for the licensing inspection process.

Desert Aurora Medical Center

Desert Aurora Medical Center

Project consisted of the construction of 2-story medical office building including surgical services. The masonry building with structural steel decking at second floor included elevator, med-gas, nurse call systems, fire alarm, and sprinkler systems. Also included an auxiliary backup generator. Site work was approximately 60,000 sq. ft.

Hi-Desert Medical Center Birth Center Addition & ED Remodel

Hi-Desert Medical Center Birth Center Addition & ED Remodel

This OSHPD project consisted of a ground-up birth center addition and remodel of emergency department. The birth center addition included 2 operating rooms, 2 labor rooms and 5 delivery rooms. 7,800 sq. ft. remodel work included new masonry block, retaining walls, a glu lam supported roof system with metal stud framing for interior walls, and the installation of complex security monitoring systems with nurse call. Entry and site work were also included in this project.

IBHS Out-Patient Medical Clinic

IBHS Out-Patient Medical Clinic

Project consisted of 15,000 sq. ft., ground-up medical center consisting of 16 medical examination rooms, nurse stations, and pharmaceutical dispensary. Project is for a non-profit organization that offers health services to low-income / uninsured individuals.

Olive View/UCLA Medical Center Seismic Retrofit

Olive View/UCLA Medical Center Seismic Retrofit

Project consisted of 253,000 sq. ft. of seismic retrofit NPC work. The OSHPD approved project included was over 22 phases of construction spread amongst 7 floors.  All mechanical, electrical and plumbing equipment was seismically refitted to the building including all fixed hospital equipment. Equipment included  X-ray machines, CT scanners cabinets, pharmacy, and rentable hospital rooms. The project was delivered 2 months ahead of schedule with a total savings back to the owner of over $1.2 million dollars.

Conejo Valley Clinic Remodel

Conejo Valley Clinic Remodel

Project consisted of interior improvements for an existing 40,905 sq. ft. exterior building shell for a full service Health Care facility. To accomplish this, the existing interior of the building was demolished and new walls and appurtenances were constructed in accordance with the attached plans and specifications. Improvements include wall partitions, HVAC components, lighting, data and communications for offices, exam rooms, and group rooms. The exterior shell remained intact with very minor alterations.

Citrus Community College Mathematics / Science Building

Citrus Community College Mathematics / Science Building

Project consisted of the new construction of 33,058 sq. ft., two story building to house classrooms and staff offices. Project included elevators and an adjacent, complimentary, single story building. Some trades include demolition, utilities, grading, paving, landscape and site improvements.

Claremont McKenna College Office of Development

Claremont McKenna College Office of Development

Project consisted of the ground-up construction of a 19,000 sq. ft., 2-story  administration building with an elevator. Includes street improvements, site work, and parking.

Harvey Mudd College Olin Lab Renovation

Harvey Mudd College Olin Lab Renovation

The 3,000 sqf Harvey Mudd College Olin Laboratory remodel project consisted of extensive structural, mechanical, electrical and plumbing and architectural improvements.  Structural upgrades included the retrofitting of the building’s roof for new generator and HVAC equipment. The mechanical scope consisted of reconfigured ductwork, new exhaust fans, a packaged air conditioning system for computer server room, and laboratory phoenix exhaust system for chemical fume hoods and snorkel arms. Electrical improvements included the addition of a new 45KW and 100KW natural gas emergency backup generators and ATS systems to safeguard long-running critical laboratory experiments. Plumbing upgrades included the addition of deionized and industrial water, acid waste and vent piping, as well as emergency showers and eyewash stations. Architectural improvements included new laboratory chemical resistant resin countertops and sinks, shelving with integrated electrical, natural gas turret systems. Added laboratory equipment included Kewanee fume hoods with custom water, gas, and phoenix valve control and alarm systems. Construction for this project was completed on time and is currently under punchlist and closeout.

Harvey Mudd College Parsons Renovation

Harvey Mudd College Parsons Renovation

Project consisted of the interior renovation of three floors of the Parsons Engineering building. Scope included modernizing 25,000 sq. ft. of faculty office, classroom and laboratory space into new clinic design space, laboratories, conference rooms, hallways, department office, break rooms, and gallery. The work also included extensive demolition to accommodate the new open floor plans, upgrade and expansion of HVAC, electrical, plumbing systems and installation of new finishes. The project was successfully completed ahead of the allotted 12-week summer break schedule.

Pitzer College Gold Student Health & Wellness Center

Pitzer College Gold Student Health & Wellness Center

Remodel of the 13,500 sq. ft. 2-story Gold Health and Wellness Center includes the extensive interior and exterior renovation while bringing the facility to 2010 code requirements. This includes an overhaul of electrical, mechanical, plumbing and roofing systems. Structural upgrades include the erection of a 2ndfloor deck above fitness room to add a studio for Yoga and Pilates, new front entry canopy and pool side trellis. The renovation of the front façade includes new exterior windows and plaster for more natural light into the facility and a new lobby storefront and entry canopy.  The remodel of the kitchen and dining room will add state of the art food service equipment including a pizza oven, grills, service counters, hoods, exhaust and ansul fire suppression system. Restroom, shower and locker facilities are part of the renovation. The existing pool area will be refurbished with new pool finishes, light fixtures,  pumps and filters. This project is on schedule to complete by the end of May 2014.

Pitzer College Scott Hall Renovation

Pitzer College Scott Hall Renovation

Project consisted of extensive demolition, renovation and structural upgrade of existing 23,000 sq. ft. administration and classroom building.

Child Development Center

Child Development Center

Project consisted of 1-story, ground-up construction, offsite/onsite improvements, and recreation yard. Project included a large, outdoor play ground, administrative office for staff, conference room, and multi-purpose class rooms. The project was unique because construction occurred adjacent to school and during an active school year. 12,500 sq. ft.

HACSB Vista Del Sol Senior Housing Complex

HACSB Vista Del Sol Senior Housing Complex

Project consists of ground-up clubhouse, office facility, and multiple pods of buildings consisting of two and three bedroom units. Ground-up construction totaling over 51,000 sq. ft. of living space. Project also included extensive landscape construction.

Casa Blanca Resource Center

Casa Blanca Resource Center

Project consisted of ground-up construction of  public resource center for the City of Riverside. The facility is 16,000 sq. ft. and features post modern architecture.

Arlington Library Addition & Historical Renovation

Arlington Library Addition & Historical Renovation

Project consisted of new ground-up addition to existing 100 year old URM Carnegie Library and Historical Fire House Building. Historical restoration included retaining of historic features and seismic upgrades with modern ADA compliant interior. New addition consisted of masonry, steel and wood frame construction and included custom brick and plaster exterior with custom landscape and brick paver hardscape. Interior features included vaulted and custom wood ceiling and clerestory windows. Also included custom CCTU, CATU and computer systems. Custom granite and hardwood millwork.

Rosetta Canyon Fire Station & Community Park

Rosetta Canyon Fire Station & Community Park

Project consisted of ground-up fire station & community park. Fire station included 3-bay area totaling 12,000 sq. ft. and, 8,000 sq. ft. of offices. Also included 1 storage building. Park consisted of tot lot area with playground equipment with canopy shade cover, little league baseball field, two tennis courts, and two basketball courts.  Exterior buildings include a restroom building complete with equipment rental room.  Project also included new dog park with two separate areas for large and small dogs.

City of Santee Aquatics Center & YMCA

City of Santee Aquatics Center & YMCA

Ground-up YMCA complex includes an aquatic facility with two Olympic pools, bath house, food facilities, gymnastic center and administrative office with large and small multipurpose classroom. Work included, site work, utilities, parking, and street improvements. 40,000 sq. ft.

Rialto Senior Center

Rialto Senior Center

Project consisted of new construction of 18,000 sq. ft. Senior Center, including commercial grade kitchen, two catering cafeterias, multi purpose room, conference rooms, hair salon, and a bank. Parking and major site work was also included.

Hillcrest Aquatics Vapor Emissions Repair

Hillcrest Aquatics Vapor Emissions Repair

This project consisted of the complete removal of the Natatorium roof along with abatement, re-framing, re-plastering, and painting of the interior underside of the new roof that was installed. Additionally covered in this cost was the installation of new fire sprinkler branch lines, start up the Desert Air System, cut-in new eaves along the exterior of the structure, and miscellaneous painting.

Pacific Palms Hotel Restautant & Salon Remodel

Pacific Palms Hotel Restautant & Salon Remodel

This project remodeled existing space to accommodate a restaurant and salon. Architectural, mechanical, electrical and plumbing upgrades were conducted to create a luxurious, new spa and salon. Architectural upgrades include an addition of a new jacuzzi, cascading water feature, and antique sculptures emanating style with a natural palette of color contrasting the clean essence of the spa. Mechanical, electrical and plumbing upgrades in the restaurant include a new package AC unit, a duct furnace, multiple exhaust fans, an emergency power transfer system and interior design modifications.

SCE Menifee Substation Office

SCE Menifee Substation Office

Project consisted of 25,000 sq. ft. ground-up metal building, to house offices, break room, cubicle space, storage/filing room, and parking lot. Project is certified LEED Silver. Also included Sewer pump station, off site sewer and water, decorative color concrete, metal shade canopies.  All metal was grounded to copper grounding grid.

SCE RDC 2,4, & 5 Photovoltaic Panel Installations

SCE RDC 2,4, & 5 Photovoltaic Panel Installations

Projects consisted of the installation of rooftop mounted solar panels and equipment as well as interconnecting them into SCE electrical grid. Work included installing Sunpower modules, wiring to combiner boxes, wiring of DC power to inverters at various enclosure locations, and wiring 12 KV AC power to switch gear and transformer for distribution back to SCE’s power grid. Work also involved constructing multiple equipment enclosures to house all the various components. Masonry enclosure was plastered with reveals to match existing building. EIFS conduit chase were also constructed.

The RDC 2 project consisted of (5,928) 2 MW panels, the RDC 4 project consisted of (15,680) of 5 MW panels, and the RDC 5 project consisted of (15,900) of 5 MW panels.

SCE Whirlwind Substation

SCE Whirlwind Substation

Project consisted of new construction with heavy mechanical and electrical system with associated site work and parking. Off-site & on-site Sewer pump station, off site sewer and water.  All metal was grounded to copper grounding grid, electrical grid reconditioning, capable of redirecting energy to other substations in the event of a power failure.

SDG&E Centinela Substation Control Building

SDG&E Centinela Substation Control Building

Project consisted of new substation control building with 230 kV switchyard.

Sunpower Sweetwater Project

Sunpower Sweetwater Project

The SunPower Sweetwater project consisted of the installation of 2MW photovoltaic panels at seven different public schools within the Sweetwater School District.  Perera Construction managed the construction of ground-mount, fixed-tilt PV systems, multiple carports and shade-structures, and rooftop mounted solar systems.  These projects were completed within two-months of receiving DSA permits.

Sunpower Ontario Convention Center Photovoltaic Panel Installation

Sunpower Ontario Convention Center Photovoltaic Panel Installation

Project consisted of the installation of 700 Kilowatts peak Sunpower® Solar Electric (Photovoltaic) System consisting of 2,100 solar modules and associated electrical equipment.